Energy Upgrade to Ballincollig home
Hayfield energy upgrade. This fine house was constructed in 2004. The clients found the house impossible to heat with winter heating cost at several hundred Euro bi-monthly. With the boiler running almost constantly, the living area was always cold, and the kitchen so hot they sometimes had to open the windows.
PMNA carried out a survey, cost report and agreed a scope of works. We managed the procurement of the energy upgrade works. We brought in a project manager to co-ordinate the tradespeople needed, as some of the technical solutions required specialist investigations to determine the failures in the existing systems.
“I found Paul to be a good listener and take any suggestions you may have on board. He is always available when needed. I was very happy with him as my architect as he carries out his work very professionally. I would not hesitate to employ him again in the future. I would be very happy to recommend him to others. (Seamus Curran, Hayfield)”